| 1 |
5.3.5.03. |
Belanja mobilisasi 1 paket x 10.100.000, lapis perekat aspal cair 324 liter x 16.000, laston lapis aus (AC-WC) 98 ton x 1.690.000, bahan anti pengelupasan 7 kg x 100.000 |
181.604.000 |
PBK |
| 2 |
5.3.5.03. |
Belanja split 22 m3 x 320.000, pasir 16 m3 x 330.000, semen 138.000, benang 4 rol x 5.000, papan bekisting 27 lbr x 17.000, paku 1 kg x 22.000, ember 6 buah x 25.000 |
21.113.000 |
PBK |
| 3 |
5.3.5.03. |
Belanja split 95 m3 x 320.000, pasir 64 m3 x 330.000, semen 552 zak x 59.000, benang 4 rol x 5.000, papan bekisting 76 lbr x 17.000, paku 4 kg x 22.000, ember 6 buah x 25.000 |
85.638.000 |
PBK |
| 4 |
5.3.5.03. |
Belanja tiang lampu besar 10 unit x 1.100.000, kabel sr 450 unit x 10.000, kabel samsung Et 15 meter x 15.000, lampu 45 watt 10 buah x 215.000, fitting dan kap lampu 10 set x 36.500, isolasi 3 buah x 11.000 |
18.273.000 |
PBK |
| 5 |
5.3.5.03. |
Belanja semen 3 zak x 59.000, pasir 1 m3 x 340.000, split 1 m3 x 330.000 |
847.000 |
PBK |
| 6 |
5.3.5.03. |
Belanja tiang lampu kecil 20 unit x 600.000, kabel sr 400 unit x 10.000, kabel sambung Et 30 meter x 15.000, lampu 25 watt 20 buah x 56.000, fitting dan kap lampu 20 set x 36.500, isolasi 3 buah x 11.000 |
18.333.000 |
PBK |
| 7 |
5.3.5.03. |
Belanja split 22 m3 x 320.000, pasir 16 m3 x 330.000, semen 138 zak x 59.000, benang 4 rol x 5.000, papan bekisting 27 lbr x 17.000, paku reng 1 kg x 22.000, ember 6 buah x 25.000 |
21.113.000 |
PBK |
| 8 |
5.3.5.03. |
Belanja tiang lampu besar 10 unit x 1.100.000, kabel sr 450 unit x 10.000, kabel sambung Et 15 meter x 15.000, lampu 45 watt 10 buah x 215.000, fitting dan kap lampu 10 set x 36.500, isolasi 3 buah x 11.000 |
18.273.000 |
PBK |
| 9 |
5.3.5.03. |
Belanja tiang lampu besar 10 unit x 1.100.000, kabel sr 450 unit x 10.000, kabel sambung sr 15 meter x 15.000, lampu 45 watt 10 buah x 215.000, fiting dan kap lampu 10 set x 36.500, isolasi 3 buah x 11.000 |
18.273.000 |
PBK |
| 10 |
5.3.5.03. |
Belanja split 150 m3 x 320.000, pasir 115 m3 x 330.000, semen 874 zak x 59.000, benang 10 rol x 5.000, papan bekisting 201 lbr x 17.000, paku 4 kg x 22.000, ember 6 buah x 25.000 |
141.221.000 |
PBK |
| 11 |
5.3.5.03. |
Belanja split 22 m3 x 320.000, pasir 16 m3 x 330.000, semen 138 zak x 59.000, benang 4 rol x 5.000, papan bekisting 27 lbr x 17.000, paku 1 kg x 22.000, ember 6 buah x 25.000 |
21.113.000 |
PBK |
| 12 |
5.3.5.03. |
Belanja semen 17 zak x 59.000, pasir 5 m3 x 320.000, split 2 m3 x 315.000 |
3.233.000 |
DDS |
| 5.3.5.03. Belanja Modal Jalan - Bahan Baku/Material (Sub Jumlah) : |
549.034.000 |
|